Two-stage tender
In a two-stage tender the main contractor is appointed early, on preliminaries and overheads and profit, before the design is finished. They then help develop the design and price the packages in the second stage. It matters to subcontractors because package pricing happens with a contractor already in place and influencing who is asked.
Traditional procurement finishes the design, then prices it. Two-stage procurement brings the contractor in during design, which is why it's used on complex or fast-moving schemes.
For a specialist subcontractor the consequence is practical: your route in is through the contractor appointed at stage one, and that happens earlier than you might expect. If you only start paying attention when packages go out, the relationships that decide the enquiry list are already formed.
It also means early contractor involvement in design, which creates an opening for manufacturers and specialist subcontractors who can genuinely help solve a buildability or cost problem at that point.
Asked alongside this
What is the difference between one-stage and two-stage tendering?
One-stage prices a completed design and appoints on that price. Two-stage appoints the contractor early on preliminaries and overheads and profit, then develops the design and prices packages with them in place.
Why do clients use two-stage tendering?
To get the contractor's input during design, to start earlier, and to manage risk on complex schemes. It trades some price certainty at the outset for programme and buildability.