How do I get on a main contractor's or developer's approved list?

The short answer

There are two steps and most firms only do the first. Registering on a contractor's supply chain portal and holding the right accreditations makes you eligible. Being invited to price work is a separate thing, decided by a buyer or quantity surveyor choosing names they recognise. You need both.

The public sector version of this question is straightforward. Councils publish approved lists, you apply, you meet the criteria or you do not. Brighton and Hove, Kensington and Chelsea, Greenwich and most other authorities set theirs out plainly on their websites.

The private sector version is the one people actually mean, and it works nothing like that.

Step one: become eligible

Most Tier 1 and larger Tier 2 contractors run a supply chain portal or onboarding process. What they want is broadly consistent:

  • Two to three years of filed accounts, or a credit check they are comfortable with
  • Employer's and public liability insurance at the levels they specify, often £5m or £10m
  • A health and safety accreditation. Constructionline, CHAS, SafeContractor, SMAS or Achilles are the common ones, and several contractors will accept any SSIP member scheme
  • ISO 9001, and increasingly 14001 and 45001, for larger packages
  • Two or three project references at comparable value

Get those in place and you can be onboarded. This part is paperwork and patience, and it's genuinely necessary. It's also where most firms stop.

Step two: get invited

Here is the part nobody writes about. A contractor's approved list might hold two hundred groundworkers. When a project comes up, the estimator sends the package to six.

Those six are not picked at random, and they are not picked by the system. They are picked by a person, usually an estimator, buyer, procurement manager or the project QS, working from who they know, who they have used before, and who came to mind.

Being on the list makes you selectable. It doesn't make you memorable.

This is why firms tell us they have been approved by a contractor for three years and never been asked to price anything. Nothing has gone wrong. They were simply never in anyone's head at the moment the list was drawn up.

Who actually decides

It varies by contractor and by package size, but the names worth knowing are usually:

  • The estimator or bid manager on the scheme, who issues enquiries
  • The procurement manager or buyer, who owns the supply chain relationship
  • The project quantity surveyor, who often has a strong say on specialist packages
  • The contracts manager or project manager, particularly where something went wrong last time and they want a change

On a smaller contractor it might be one person wearing all four hats. On a Tier 1 it's four different people in three offices.

What actually moves the needle

Be known before the enquiry goes out. That's the whole thing. Not a chase at tender stage, when the list is already drawn, but a relationship built in the months before, when nobody is under pressure.

In practice that means knowing which contractors are active in your region and sector, knowing who holds those four roles there, and giving them a reason to remember your name that's not a sales pitch. A note about a scheme they have just started. A comment on something they posted. Something that shows you follow their work.

It's slow and it's unglamorous, and it's the difference between being on a list and being on a tender.

Where this stops helping

None of this helps if your pricing is uncompetitive or your last job for them went badly. Relationships get you the invitation. They don't win you the job, and they won't survive you letting someone down.

Related questions

The questions that come with it

Is there a single approved list I can apply to?

No. Each main contractor and developer runs its own, and most require you to register directly through their supply chain portal.

What accreditations do I need to get on a contractor's supply chain?

Usually a SSIP member scheme such as CHAS, SafeContractor or SMAS, Constructionline for many contractors, appropriate employer's and public liability insurance, and ISO 9001 for larger packages.

How long does supply chain approval take?

Typically a few weeks once you have the documents together. Gathering the documents is what takes most firms longer.

We're on the approved list but never get invited to tender. Why?

The list determines who can be invited, not who is. Enquiries go to a handful of names the estimator or buyer thought of, so firms that are not known to those people are rarely included.

Who decides which subcontractors get invited to price a job?

Usually the estimator or bid manager issuing enquiries, influenced by the procurement manager and the project quantity surveyor.

Being known before the enquiry goes out

That's the whole job we do. We'll show you which contractors we would target for you, and who we would be talking to there.